Infrastructure
Setup
WOOD STORE: In house seasoning facility allows us to maintain optimum quantity and superior quality of wood at any point of requirement. Our in-house transportation facility helps us to maintain availability of wood optimum.
MACHINE HALL: 37,000 sq ft area is dedicated and occupied with wide range of modern and automatized machines with capacity of processing around 40 cbm / day.
ASSEMBLY SECTION: 20,000 sq ft was dedicated for assembly of handicrafts with highly skilled and experienced craftmen.
METAL POWDER COATING UNIT: 10,000 Sq. Feet Area for Powder Coating Unit is installed.
SANDING AREA: 15,000 sq ft is dedicated for sanding booths.
FINISHING SETUP: Finishing area is well equipped with 3 spray booths and spread over 20,000 sq ft with well experienced finishing staff.
INSPECTION AREA: Quality of furniture is the key element which an exporter has to keep in mind while manufacturing and delivering the furniture. Experienced Quality staff of 6 members have been deployed in the field which pays keen attention from white part till the final finished product till packaging to maintain the best of the quality.
PACKAGING AREA: Dedicated packing area of 20,000 sq ft is allotted to process packing of 35 cbm wood material per day.
WAREHOUSE AREA: 25,000 sq ft of storage area has been dedicated to store the packed materials which is ready for stuffing into the container in a dust free area.
Future Expansion
PWI has acquired a land area of 1,00,000 sq feet area in which we are planning to setup a nice and automatic finishing line with high end packaging setup.
Metal furniture manufacturing unit
-
Proposed State of Art Metal Manufacturing Unit with Capacity of 10 ton Per Month.
-
Metal Working Machines are in Planned as , (Drilling Machines, Grinding and Polishing Machine, Punching Machines, Metal Bender , Metal Circular Saw, Metal Bend Saw, Shearing Machine and Power Press , Material Handling Equipment.